|
*
RETAIL SPACE |
*
OFFICE SPACE |
*
APARTMENTS |
*
TOWN HOMES |
|
|
| Your commercial
structure will be constructed using cutting edge modular
building technology. This results in a stronger, more
durable structure using building practices that maximize
efficiency and decrease your overall project time. |
| |
| Building
materials are bought in large volume, decreasing your
material cost. Marterials are stored indoors along with
your building during the entire construction process.
This protects your building from weather exposure and
delays as well as material theft from being unprotected
on your job site. |
| |
| *
Volume Buying Power |
 |
| *
Superior Construction |
| *
Built Indoors |
| *
Faster Building Time |
| |
| |
| When the
modular sections of your building are complete, they are
weather sealed and prepared for delivery to your site,
which will have been prepared while your building was
being constructed at the factory. |
| |
| Your building
will arrive on site approximately 80% complete and can
be setup and weather tight in as little as 1 day. Contact
AGL Homes today to find out more about your commercial
building options. |
| |
CALEDONIA
OFFICE |
MANCHESTER
OFFICE |
4305
State Route 5 |
3180
State Route 96 |
Caledonia,
NY 14423 |
Clifton
Springs, NY 14432 |
585-226-2727 |
315-462-9401 |
Call
today or email us at |
|
|